全国服务热线 15075212345

挡土墙模具生产工艺

发布:2022-06-27 17:43,更新:2024-11-20 20:30


挡土墙模具供应厂家,生产工艺简单易懂,易脱模,产品表面光滑,生产整个过程中,产品质量和结构都相对稳定。拆模过程看似简单,但是也是要按照相应的步骤进行的,如果超过不当,会造成二次使用防撞墙模板的困难。一般都是先要拆上下的拉杆,然后拆左右的螺丝,之后使用铁锤慢慢敲击模板,这样就可以了。


The retaining wall mold supplier has simple production process, easy demoulding, smooth product surface, and relatively stable product quality and structure during the whole production process. The formwork removal process seems simple, but it should also be carried out according to the corresponding steps. If it is not exceeded properly, it will be difficult to use the anti-collision wall formwork again. Generally, the upper and lower pull rods shall be removed first, then the left and right screws shall be removed, and then the hammer shall be used to slowly knock the formwork, so it is OK.




模具的生产成本很低在进行施工的过程中,按操作过程来进行施工就可以了,模具加工的方法非常的简单,比往常的制作方法快很多,阶梯式挡土墙模具的壁厚在三公分左右,加工出来的挡土墙会很耐用,使用的时间也长,模具加工出来的护坡的耐用性非常的好,所以很多的工程都在应用模具加工的方法来进行施工。


The production cost of the mold is very low. During the construction process, it is OK to carry out the construction according to the operation process. The mold processing method is very simple and much faster than the usual production method. The wall thickness of the mold for the stepped retaining wall is about 3cm. The processed retaining wall will be very durable and use for a long time. The durability of the slope protection processed by the mold is very good, So many projects are using mold processing methods to carry out construction.


联系方式

  • 地址:清苑工业园区
  • 电话:15075212345
  • 联系人:高通
  • 手机:15075212345
  • 微信:15075212345
  • QQ:729576224
  • Email:729576224@qq.com